Project Case Study

The typical project cases, especially aerogel insulation projects showcase our expertise in delivering professional custom aerogel solutions.

Contact us today to learn how our aerogel materials can revolutionize your project and pave the way to a greener and more efficient future.

Project Case 1

  • Over 40% energy was saved of 1.7km urea medium-pressure steam pipeline
  • Only 2.5 years to recover the total inventment. Worth it!

Project Case 2

  • Over 70% energy was saved of 6.7km medium-pressure steam pipeline.
  • Only 1.5 years to recover the total inventment. Worth it!

Project Case 3

  • Our 60mm thick aerogel insulation blanket replaced 150mm thick alumina silicate wool on drilling platform diesel generator exhaust pipes.
  • Reduced pipe temper. and saved space. Worth it!
  • CryoFelt LD and diene hydrocarbon foam composite insulation solution for LNG pipes of CNPC Changqing Oilfield. 
  • Worth it!

Project Case 1

  • It took 3 months to finish this insulation modification project in 2019 in Jiangsu, China.
  • Compared with the previous insulation material—aluminum silicate wool(160mm thick), our ThermFelt-HT650 High Temperature Aerogel Insulation Blanket(≤650℃)(50mm thick) can save over 40% energy of 1.7km urea medium-pressure steam pipeline in the chemical plant. What’s also saved is the pipeline installation spcace and costs of maintenance and disposal. As our aerogel blanket is 100% inorganic and lifespan up to 25 years.
  • Every year, almost 1700tons/km of CO2 emisson is reduced.
  • It took only 2.5 years for the chemical plant to recover the total investment(CNY2092,100). Worth it!

User Type

Chemical Plant

Thermal Insulation Object

Thermal powered urea medium-pressure steam pipeline

Location

Jiangsu, China

Year

2019

Construction Period

3 months

Pipeline Outer Diameter

325mm

Length of Insulation Modified Pipeline

1700m

Pipeline Internal Medium Temperature

365-375℃

Surface Temperature of Insulation Layer

32-35℃(10℃ higher than ambient temperature)

Previous Insulation Material

Aluminum Silicate Wool: 160mm thickness

Aerogel Material Applied

ThermFelt-HT650 High Temperature Aerogel Insulation Blanket(≤650℃): 50mm thickness

Energy Saving Rate 

43%

Total Investment

CNY2,092,100

Investment Recovery Period

2.5 years

Project Parameters

Before Modification

After Modification

Inlet Pressure (Mpa)

2.3

2.3

Inlet Temperature (℃)

370

370

Enthalpy of Inlet Steam (kJ/kg)

3,177.34

3177.34

Flow Rate (t/h)

50

50

Energy Carried by Steam into the Pipeline per Hour (kJ)

158,867,000

158,867,000

Outlet Pressure (Mpa)

2.05

2.07

Outlet Temperature (℃)

315

336

Enthalpy of Outlet Steam (kJ/kg)

3,058.46

3105.79

Energy Carried by Steam out of the Pipeline per Hour (kJ)

152,923,000

155,289,500

Heat Loss per Hour in the Pipeline (kJ)

5,944,000

3,577,500

Calorific Value of Standard Coal (kJ/kg)

29,273

29,273

Conversion of Heat Loss per Hour to Standard Coal (t)

0.2031

0.1222

Annual Heat Dissipation Time (h)

8,000

8,000

Annual Heat Loss in Terms of Standard Coal (t)

1,624.43

977.69

Price of Standard Coal (CNY/t)

***

***

Annual Total Loss (CNY)

******

******

Difference (CNY) – Energy Saving Efficiency per Year

******

CO2 Emission Reduction (tons/km) per Year

1,695

Project Case 2

  • It took 4 months to finish this insulation modification project in 2020 in Hebei, China.
  • Compared with the previous insulation material—Ultra-fine Glass Wool(200mm thick), our ThermFelt-HT650 High Temperature Aerogel Insulation Blanket(≤650℃)(60mm thick) can save over 70% energy of 6.7km  medium-pressure steam pipeline in the chemical park. What’s also saved is the pipeline installation spcace and costs of maintenance and disposal. As our aerogel blanket is 100% inorganic and lifespan up to 25 years.
  • Temperature reduction <1.5℃/km.
  • It took only 1.5 years for the chemical plant to recover the total investment. Totally worth it!

User Type

Chemical Industrial Park

Thermal Insulation Object

Medium-pressure steam pipeline

Location

Hebei, China

Year

2020

Pipeline Outer Diameter

630mm

Length of Insulation Modified Pipeline

6700m

Pipeline Internal Medium Temperature

200℃

Previous Insulation Material

Ultra-fine Glass Wool: 200mm thickness

Aerogel Material Applied

ThermFelt-HT650 High Temperature Aerogel Insulation Blanket(≤650℃): 60mm thickness

Temperature Reduction per Kilometer

<1.5℃

Energy Saving Rate 

Over 70%

Investment Recovery Period

1.5 years

Project Case 3

  • It took 2 months to finish this insulation modification project in 2018 and 2019 in Shanghai, China.
  • Compared with the previous insulation material—alumina silicate wool(150mm thick), our ThermFelt-HT650 High Temperature Aerogel Insulation Blanket(≤650℃)(60mm thick)  reduced pipe temperature(430-450℃) to 32-35℃(10℃ higher than ambient temperature)
    and greatly saved the  space on drilling platforms.
  • What’s also saved is the costs of maintenance and disposal. As our aerogel blanket is 100% inorganic and lifespan up to 25 years. Totally worth it!

User Type

Drilling Platform

Thermal Insulation Object

Diesel Generator Exhaust Pipes

Location

Shanghai, China

Year

Two Platforms in 2018 and 2019

Pipeline Outer Diameter

426mm

Pipeline Internal Medium Temperature

430-450℃

Previous Insulation Material

Alumina Silicate Wool: 150mm thickness

Aerogel Material Applied

ThermFelt-HT650 High Temperature Aerogel Insulation Blanket(≤650℃): 60mm thickness

Surface Temperature of Insulation Layer

32-35℃(10℃ higher than ambient temperature)

Energy Saving Effect

The cabin temperature is reduced, and the space margin between the cable tray is guaranteed.

Project Case 4

  • Compared with traditional insulation materials, the pipeline installation spcace and costs of maintenance and disposal is greatly saved, as our aerogel insulation material lifespan is up to 25 years. Worth it!