HOW CWS TECHNOLOGY BENEFITS YOU
Our solutions and state of the art products will give you peace of mind from a project that is not going to leak.
Just see a few of the numerous benefits when compared to traditional membranes:
Are you a Consultant/Designer, Contractor or Developer? CWS technology has benefits for everyone involved in construction.
Click below and see what’s in it for you.
CONSULTANT
Offers flexibility in design and permits innovation
Does not need a screed. Does not need geotextile anti-root protection.
Simplifies the design, less weight on structure
No seams, joints, overlaps, or multiple layers, that are the main cause of leaks
Impervious to UV radiation or root penetration
Ideal for irregular surfaces
Proven technology, backed by independent test reports
Keeps the project on budget
Earn LEED points
Protects the rebar from corrosion, may omit corrosion inhibitors
Protects against human error, much faster application
Worldwide technical support
Speeds project times
OWNER/DEVELOPER
One single application that waterproofs for 100 years +
Accelerates the opening of the project. Start getting income earlier than before
Lower future cost of use. No replacement or repair costs.
No leakage, no repairs, no complaints from tenants.
Protection against loss of rent, litigation and liability claims
No expensive re-application in the future.
Environmentally friendly – earn LEED points. Higher selling price.
MAIN CONTRACTOR
VERY Contractor-friendly
Very cost-efficient
Much less people on site, lower labor cost, higher profit
Cannot be damaged by subsequent trades, walking, drooping tools
Trafficable within six hours from application
The Podium is immediately available for use as work area
Does not require topping screed, save time and money
Readily visitable for inspection, unlike membranes covered by screed and tiles
Does not peel off, get scratched, root-punctured or dilapidated
Super-fast application protects against missing deadlines and risking liquidated damage claims.
Needs minimal labour, especially in regions facing workforce shortage.
CWS helps contractors address issues from lack of manpower and from missing deadlines
Is the lack of adequate workforce slowing your sites and affecting your cash flow? Do you face delays that may result in missing deadlines and facing liquidated damage claims?
CWS helps applicators slash project time and labor cost!
CWS products have been designed with the applicator/contractor in mind as they:
Need much less people on site
Dramatically reduce project time with their super-fast application
Protect against missing deadlines
CWS100 vs. traditional membranes
CWS100: 6000m² per day – no screed needed
Membranes & Screed: 100m² of membrane & 50m² of screed per day
Example: 10,000m² site
CWS100: 5 man days
Membrane & screed: 300 man days
CWS Admix
CWS Admix is simply added at the batch plant or mixing truck and practically requires no on-site labour whatsoever